From site assessment to final removal.

Six stages, one coordinated plan. Each stage names what we need from you and what depends on parties outside the project.

Check My Project Timeline

The delivery sequence

  1. Stage 1

    Project discovery

    You share the load, location, target energization date, and expected duration. We confirm whether the project fits the 5 to 60 MW, 1 to 7 year range we serve.

    What we need from you
    Required load, site location, schedule, existing fuel and electrical information
    External dependencies
    None yet. This stage identifies them.
  2. Stage 2

    Feasibility and system design

    We assess the site, fuel supply, electrical tie-in, and regulatory requirements, then define the generation capacity, redundancy, and layout.

    What we need from you
    Site access, facility electrical design, continuity requirements
    External dependencies
    Gas utility capacity confirmation. Air and local permitting requirements.
  3. Stage 3

    Commercial proposal and contracting

    The proposal sets out capacity, term, fuel arrangements, operating scope, performance commitments, and removal. Each party’s responsibilities are written into the agreement.

    What we need from you
    Commercial and performance requirements, contract review
    External dependencies
    Fuel supply terms. Equipment availability at the time of commitment.
  4. Stage 4

    Site preparation and mobilization

    Site work, fuel infrastructure, and electrical infrastructure are prepared. Equipment is transported to site and installed.

    What we need from you
    Site access and facility-side integration work, as agreed
    External dependencies
    Permit issuance. Gas service installation. Transport logistics and weather.
  5. Stage 5

    Commissioning and operation

    The system is tested, energized, and handed into operation. Monitoring, maintenance, and fuel coordination continue for the contract term, within the agreed scope.

    What we need from you
    Coordination for testing and energization. Operating the data center.
    External dependencies
    Utility or authority witness testing, where required. Ongoing fuel delivery.
  6. Stage 6

    Transition and removal

    When permanent power is ready, we plan the cutover with you, demobilize the equipment, and complete the site restoration defined in the agreement.

    What we need from you
    Notice of the permanent power date, cutover coordination
    External dependencies
    Utility energization date. Agreed handback condition.

What sets the schedule

Fuel availability and permits are usually decided outside the project team. They are identified in feasibility, tracked through delivery, and reflected in the schedule we commit to.

We do not publish a universal deployment time. Tell us your required power-on date and we will identify the critical path for your site.